Thai history · Airport rail

2010

How the Airport Rail Link Connected Bangkok in 2010

Trace Bangkok’s Airport Rail Link from its August 2010 opening, with the eight City Line stops, early express services and transfers to BTS and MRT.

The Airport Rail Link tied Phaya Thai and Makkasan to Suvarnabhumi through an eight-station City Line
23 Aug 2010
Rail service begins
8 stations
City Line stopping pattern
Phaya Thai
BTS connection

The short answer

The Airport Rail Link began service in August 2010, linking Suvarnabhumi Airport to Phaya Thai. An all-stops City Line served neighbourhoods along the route, and early express trains used the corridor for quicker airport journeys. Two central interchanges made the link part of the wider Bangkok transport system.

Compare the records

Three ways the rail corridor served passengers

A dated map shows which trains called at intermediate stops and where a journey could continue on another line.

Airport Rail Link stopping patterns and connections
FeatureStations or connectionPurpose
City LineEight stops between Phaya Thai and SuvarnabhumiServes intermediate districts and airport passengers.
Former Makkasan expressMakkasan and SuvarnabhumiOffered a limited-stop airport service.
TransfersBTS at Phaya Thai and MRT at Phetchaburi via MakkasanContinues a journey beyond the airport corridor.

Chronology

A timeline of the turning points

  1. Suvarnabhumi Airport starts operations

    The new airport established a major destination outside central Bangkok.

  2. Airport Rail Link opens

    The operator dates the start of service to this day.

  3. Express operation suspended

    JICA’s retrospective identifies the suspension of express services.

The corridor built for the airport

The operator’s strategic plan gives 23 August 2010 for opening, and describes an alignment of about 28.5 kilometres. The government station guide lists eight City Line stops. From the city they were Phaya Thai, Ratchaprarop, Makkasan, Ramkhamhaeng, Hua Mak, Ban Thap Chang, Lat Krabang and Suvarnabhumi. The last station sat inside the airport, making it possible to continue from the train to the terminal.

Sources for this section: [1] · [3]

How express and local trains used the same line

JICA maps both the City Line and earlier express services, including the Makkasan airport express. A local train could carry people making shorter trips between intermediate districts. An express train made fewer stops to serve a different journey on the shared alignment. JICA dates suspension of the express operation to September 2014, so a historical rail map needs a date attached to it.

Sources for this section: [2] · [3]

What the two central transfers did

Phaya Thai connects to the BTS Sukhumvit Line. Makkasan connects to the MRT at Phetchaburi, which has a different station name even though the two serve as a transfer pair. Those interchanges help explain the link’s function in Bangkok. The airport was one destination, while the metropolitan rail network let travellers reach other parts of the city from the same corridor.

Sources for this section: [1] · [3]

Continue the chronology

Connected biographies

People connected to this history

Quick answers

Common questions

When did the Airport Rail Link open?
The operating company records 23 August 2010 as its opening date.
What were the City Line’s end stations?
Phaya Thai in central Bangkok and Suvarnabhumi Airport.

Primary and institutional sources

How this history was checked

Dates, legal milestones and historical claims are checked against the official and institutional records below. This article was reviewed on 19 November 2026.

  1. S.R.T. Electrified Train CompanyStrategic plan and Airport Rail Link opening history
  2. Japan International Cooperation AgencyHistorical City Line and Express stopping patterns
  3. Thailand Government PortalAirport Rail Link stations and city connections