The short answer
Bangkok’s original underground Blue Line ended at Hua Lamphong and Bang Sue. Its later extensions took different routes across the Chao Phraya and met at Tha Phra. The operating dates in 2019 and 2020 explain how a line originally built between two terminals gained its loop and a western branch.
Compare the records
How the two extensions differ
Both routes reach Tha Phra, but their starting points and river crossings are different.
| Section | River and alignment | Service milestone |
|---|---|---|
| Hua Lamphong through Tha Phra toward Lak Song | Runs through the old city and tunnels beneath the Chao Phraya on its way west | September 2019. |
| Bang Sue through Tao Poon to Tha Phra | Runs via the Purple Line junction and crosses the river on the northern side | March 2020. |
Chronology
A timeline of the turning points
Operating arrangements for the expanded line
MRTA and BEM signed agreements covering the wider network.
Western section enters service
The extension beyond Hua Lamphong connected the old city with the route to Lak Song.
Northern and western connection enters service
The section from Bang Sue through Tao Poon reached Tha Phra.
Extension ceremony
MRTA records a later ceremony for the expanded line at Sanam Chai.
From Hua Lamphong toward Lak Song
MRTA’s description follows the extension through Wat Mangkon and Sanam Chai before it goes under the Chao Phraya. The route reaches Itsaraphap and Tha Phra, then continues toward Bang Khae and Lak Song. This route is the one to follow when reading about underground stations in the old city or the branch continuing past Tha Phra.
From Bang Sue through Tao Poon
The other extension begins from the Bang Sue end of the original line and connects with the Purple Line at Tao Poon. It crosses the river farther north and approaches Tha Phra along the west side. Follow both sections on a dated map to see why Tha Phra can be both a point on a westbound journey and the end of a route that has passed around the loop.
Why an opening ceremony can follow service
MRTA lists 29 September 2019 and 30 March 2020 as the service dates of the respective sections. It separately records the ceremony of 14 November 2020. These dates identify when trains began using each extension and when the wider project received its formal opening. Earlier station lists for the original 2004 line describe a different operating network.
Continue the chronology
Related history guides
Connected biographies
People connected to this history
Quick answers
Common questions
- When did the Blue Line extensions start service?
- MRTA gives 29 September 2019 for the western extension and 30 March 2020 for the section from Bang Sue to Tha Phra.
- Where do the extensions meet?
- The two routes meet at Tha Phra on the west side of the Chao Phraya.
Primary and institutional sources
How this history was checked
Dates, legal milestones and historical claims are checked against the official and institutional records below. This article was reviewed on 19 November 2026.