Australian urban railway history

2014–2019

How Sydney Metro Northwest Opened in 2019

Trace the 2019 Sydney Metro Northwest opening from Tallawong to Chatswood and see how existing suburban stations were converted for driverless trains.

Tallawong railway station in Sydney on the first day of metro passenger service, 26 May 2019
26 May 2019
First passenger service
36 kilometres
Tallawong to Chatswood
13 stations
Eight new and five upgraded

The short answer

Sydney Metro Northwest started carrying passengers on 26 May 2019 between Tallawong and Chatswood. The 36-kilometre line combined newly built infrastructure with existing railway sections converted for driverless metro trains. Its opening brought eight new stations and five upgraded stations into a single service.

One line assembled from new and existing works

How the first Sydney Metro route was made

A continuous operating line could include track that had served another kind of railway.

Physical and operating milestones of Metro Northwest.
PartWhat changedResult
New northwest alignmentNew track and stations reach Tallawong.Areas farther northwest gain a connection to the metro.
Epping to ChatswoodAn existing suburban section is upgraded to metro standards.Passengers use rebuilt station interfaces and platform screen doors.
Through serviceTesting precedes the May passenger opening.The two kinds of infrastructure operate as one metro route.

Chronology

A timeline of the turning points

  1. The state announces conversion planning

    An existing suburban rail link forms part of the future metro alignment.

  2. A train tests the full route

    The test runs from Tallawong to Chatswood before passenger opening.

  3. Metro Northwest opens

    The automated trains enter public service on the original 36-kilometre route.

How the conversion fits the original project

The new line reached northwest Sydney from an existing suburban railway corridor. The Epping–Chatswood section had to be changed for metro operation. The state’s planning record identifies changes to signalling and stations. The conversion record documents installation of platform screen doors and changes to station facilities.

Screen doors have to align with train doors when a train stops in the correct position. That illustrates how a track alignment can be reused while hardware, operating rules and the platform interface change substantially.

Sources for this section: [4] · [2] · [5]

What the test date establishes

Sydney Metro records a train travelling the full length of Metro Northwest from Tallawong to Chatswood in January 2019. The test showed that a train could complete a through journey before regular passengers were carried. The operator gives 26 May for the start of public service.

Sources for this section: [3] · [1]

Which stations belonged to the first opening

The line opened with eight new stations and five upgraded stations, according to Sydney Metro. The initial 36 kilometres ended at Chatswood. That is the useful boundary when reading about the 2019 service, since subsequent stages brought the metro farther into Sydney. At opening, the combination of converted rail and new track was already central to the way the line had been delivered.

Sources for this section: [5] · [1]

Continue the chronology

Connected biographies

People connected to this history

Quick answers

Common questions

When did Sydney Metro Northwest start regular service?
The first passenger service ran on 26 May 2019.
Which section was converted from suburban railway use?
The project upgraded the existing line between Epping and Chatswood for metro operation.

Primary and institutional sources

How this history was checked

Dates, legal milestones and historical claims are checked against the official and institutional records below. This article was reviewed on 19 November 2026.

  1. Sydney MetroCorporate Plan 2024–2028: first passenger service and original Metro North West route
  2. Sydney MetroCompleted conversion between Epping and Chatswood, 2019
  3. Sydney MetroFirst complete train test on Metro Northwest, January 2019
  4. NSW GovernmentPlanning the conversion of the Epping to Chatswood railway, 2014
  5. Sydney MetroTransforming Sydney 2021: the eight new and five upgraded stations