The short answer
Bharatmala was designed around networks and bottlenecks rather than a single road opening. Its 2017 approval authorised a large programme, but an authorised kilometre was not necessarily a contracted or completed kilometre. Reading the original plan alongside the 2023 performance audit makes those different claims visible.
Chronology
A timeline of the turning points
Cabinet approval
Phase I is approved for the original 2017–2018 to 2021–2022 implementation period.
Minister explains the programme
Gadkari describes corridors, freight efficiency and connectivity objectives.
Funding and scope clarified
A parliamentary reply distinguishes Bharatmala’s approved work from additional ongoing highway schemes.
Original planning horizon ends
The approved period is a target window, not evidence that all included projects were complete.
Performance audit tabled
CAG’s report examines planning, finance, implementation and monitoring.
The plan addressed how traffic moves through a network
Bharatmala’s stated purpose was to improve freight and passenger movement by closing critical gaps. Economic corridors, feeder routes, border and coastal connections, port access and expressways formed different components. The programme also sought to relieve bottlenecks on existing national corridors.
These categories describe different transport problems. A bypass can reduce congestion without connecting two previously unconnected regions; a feeder road can make a main corridor useful to a wider area. Counting only a total length can conceal those differences in function and benefit.
The approved length included inherited work
The original Phase I total was 34,800 km: approximately 24,800 km of programme components plus 10,000 km of balance work under the National Highways Development Project. Its approved outlay was ₹5.35 lakh crore. These were development and upgrading commitments, not a claim that every kilometre would be a road where none previously existed.
The Ministry separately described work under other ongoing schemes. Combining those lengths or their budgets with Bharatmala without explanation produces a larger number answering a different question. A sound comparison first fixes the programme boundary and the period to which the figure belongs.
Approval, contract award and completion are different milestones
Cabinet approval sets a programme and financial framework. Project preparation, procurement and award create further commitments. Construction and commissioning occur later, often in stages. The existence of an approved total therefore cannot be used as evidence that the same amount of completed infrastructure was already available.
This distinction also affects timing. The original five-year period ended in 2021–2022, while later reporting measured work still under execution. To assess progress, compare the same component, the same unit and the same reporting date, rather than switching between announced scope and physical completion.
The audit challenged boundaries, bottlenecks and cost control
CAG’s performance audit was tabled on 10 August 2023. PRS’s summary records concerns about already developed or previously awarded highways being included in the wider network and about incomplete NHDP projects transferred without resolving obstacles. Land availability and forest-related disputes were among the examples of bottlenecks.
Contemporary reporting of the audit also described changes in specifications, scope and project cost. Those observations matter because delivery has both a physical and a financial denominator. Completing more expensive or differently specified work cannot be compared with an original estimate as though the two were unchanged measures.
Ministerial advocacy and independent evaluation answer different questions
Gadkari’s 2017 statement expressed the government’s expectations about connectivity, economic activity and freight movement. It establishes what the programme was intended to achieve. The audit asks how planning and implementation measured up to the approved framework.
Neither should be substituted for the other. A proposal can address a real transport need while suffering weak project preparation or cost controls. Conversely, a specific audit criticism does not establish that every road is useless or that no construction occurred. The historical assessment depends on the particular objective, stage and evidence being discussed.
Continue the chronology
Related history guides
Biography context
Explore India through connected lives
Connected biographies
Ministerial and Cabinet leadership

1957–
Nitin Gadkari
BJP politician, parliamentarian and road transport ministerNitin Gadkari’s political reputation rests heavily on transport infrastructure. From Maharashtra’s public works department he moved into national BJP leadership, Parliament and the Union road ministry. Large construction programmes made him a prominent administrator while company-funding controversies and official audits complicated the record.Read biography
1950–
Narendra Modi
Prime minister and former chief minister of GujaratNarendra Modi rose through RSS and BJP organisation before becoming chief minister of Gujarat and then prime minister in 2014. Electoral success, welfare and infrastructure programmes, centralised leadership and disputes over minority rights and state power have shaped his career.Read biographyQuick answers
Common questions
- Did the Cabinet announce 34,800 km of finished roads?
- No. That was the approved Phase I scope for development or upgrading, including 10,000 km of balance NHDP work.
- Was every Bharatmala project a new expressway?
- No. The programme included several corridor and connectivity categories, improvements to existing routes and inherited unfinished work.
- Does a contract award mean construction is complete?
- No. Award is a procurement milestone. Completion and opening to traffic require further work.
- What did the 2023 audit add?
- It scrutinised programme planning, finance and implementation, including inherited bottlenecks, project boundaries and cost changes. Its findings qualify claims based only on the original announcement.
Primary and institutional sources
How this history was checked
This is a history of the 2017 approval and selected findings of the 2023 audit, not a live road-completion dashboard. The CAG report record was verified; its PDF’s selected indexed material, PRS’s detailed summary and contemporary reporting were consulted. The early portrait is illustrative, not an image of the programme launch. This article was reviewed on 31 August 2026.
- Ministry of Road Transport and Highways / PIBGadkari explains Cabinet-approved Bharatmala Phase I, 25 October 2017
- Ministry of Road Transport and Highways / PIBAllocation of funds for Bharatmala projects, 12 March 2018
- Comptroller and Auditor General of IndiaReport 19 of 2023: Implementation of Phase I of Bharatmala Pariyojana
- PRS Legislative ResearchSummary of CAG’s Bharatmala performance audit, 2023
- The Indian ExpressAudit finds changes increased highway project costs, 11 August 2023
- Gppande / Wikimedia CommonsNitin Gadkari: complete photograph, provenance and CC BY-SA 3.0 grant
- Creative CommonsAttribution-ShareAlike 3.0 Unported licence